I posted some "before" pictures of my new studio/workshop last month. We're making progress, slowly but surely. I've got almost all of the moving boxes either packed or moved inside the house. The plumbers have added the pipes so we can put a sink in. I use water to clean the glass, in the grinder, to drill holes, etc., so the sink is one thing I really need. The electrician has added breakers and wiring, including the 220v and special outlet for the new kiln. And we bought insulation and drywall to finish the walls, and lumber for work tables and shelving. At this rate it's going to take us at least 6 months to get the remodeling finished, and that's if we work on it during every spare minute. But it's the journey, not the destination, right?